linkedin 2 twitter 2

EDRG Awarded SHRP2 Project C32-Continuation of TPICS

The TPICS products, all developed by EDR Group for the SHRP2 program, consist of 100 before and after case studies, and a website (http://www.tpics.us/), used for searching and applying those case study findings to real-world planning and project evaluation.

EDR Group is the prime contractor on a team with ICF International and Susan Jones Moses & Associates, in preparing studies and materials designed to provide training in case study preparation at state DOTs and MPOs to supplement the current case studies in the TPICS web-based analysis system.  This project consists of six tasks:

•             Maintenance of the Existing TPICS Web Site

•             National Highway Institute Course on Economic Impact Analysis

•             Improvements to the TPICS User Interface and Internal Documentation

•             Development of a TPICS Forum/Discussion Community

•             Intake of New TPICS Case Studies

•             Incorporation of C11 Analysis Tools into TPICS

 

 

Latest Blogposts

Twitter Feed

States Employ New Transportation Methods to Boost Efficiency, Reduce Costs | Best States | US News https://t.co/aIST5pUW8K
Is a US transit funding crisis looming?... "To help strengthen its case to win extra federal funding, APTA commissi… https://t.co/va9yL93QaS
Transnational exchange about developments in automated driving. https://t.co/tUDJcMKG35 @schroeck_k https://t.co/1VtOfk2a2S