×

Warning

JUser: :_load: Unable to load user with ID: 62

Columbia River Crossing Economic Impact Study

By DEA and EDR Group for the Columbia River Crossing Organization.

EDR Group conducted economic impact analysis for a proposed reconstruction and expansion of the I-5 bridge over the Columbia River along the Oregon-Washington border. This work was conducted for a joint venture of Washington State DOT and Oregon DOT, under subcontract to David Evans Associates. The analysis focused on impacts of the locally preferred alternative that shifts bridge height and roadway capacity.

The analysis covered job and economic impacts on the Portland metropolitan area, adjacent states and entire West Coast. It included impacts associated with reduced congestion and decreased travel times, improved safety for motorists, and improved safety and efficiency for marine navigation. Those benefits were assessed by examining implications for improved access to job opportunities throughout the region, reduced trucking costs, and improving access to goods and services delivery.

Final Report

Latest Blogposts

Twitter Feed

"A 2018 study by the Economic Development Research Group found that the Qatar Airways Cargo flights to Pittsburgh p… https://t.co/lX614cTkwq
EDR Group/EBP is a proud sponsor of this week's NYSAMPO Conference in Syracuse, NY, where earlier this afternoon, P… https://t.co/u0tlfoFb1A
On July 16th, Peter Plumeau will present at the New York State Association of Metropolitan Planning Associations (N… https://t.co/S9VSWvnqMO
twitter 2 linkedin 2
 

Telephone: 1-617-338-6775 - This email address is being protected from spambots. You need JavaScript enabled to view it.

© 1997-2019 Economic Development Research Group, Inc; 155 Federal St. 6th Floor, Boston, MA 02110 USA