Ontario GO Transit Electrification Study

For Metrolinx, EDR Group, under subcontract to the ARUP/Delcan joint venture, conducted an economic impact analysis for electrifying GO Rail in Greater Toronto and Hamilton Area. Using TREDIS and conducting site visits and web research, EDR Group’s work included calculating the construction, operation, economic and land use impacts associated with the six electrification alternatives.

Electrification Study Webpage

Electrification Study Update Meeting-May, 2010

Economic Impacts Appendix-Decemeber 2010

Latest Blogposts

Twitter Feed

RT @schroeck_k: Final act of my #TRBAM. Presenting our equity analysis of mileage-based user fees at a poster session of the future of fund…
RT @EDRGroup: Investing in Climate Resilient Cities (Resiliency Series-Part 1) https://t.co/D5wuCaiKSO https://t.co/8mYQa09dax
RT @city_viewer: Discussing how #transportation governance can adapt to disruptive technology and trends in TRB Strategic Mgt Committee #TR
twitter 2 linkedin 2
 

Telephone: 1-617-338-6775 - This email address is being protected from spambots. You need JavaScript enabled to view it.

© 1997-2019 Economic Development Research Group, Inc; 155 Federal St. 6th Floor, Boston, MA 02110 USA