×

Warning

JUser: :_load: Unable to load user with ID: 62

Toronto Metrolinx Rapid Transit Projects

Under subcontract to Steer Davies Gleave for the Greater Toronto Transportation Authority, 2009

For Greater Toronto Transportation Authority, under subcontract to Steer Davies Gleave (SDG), EDR Group measured the economic impacts of public transportation improvements for Metrolinx in metro-Toronto. EDR Group was part of a team assessing the benefits cases of proposed alternatives using a Multiple Account Evaluation (MAE) framework that provides a systematic identification and analysis of broader implications and criteria of a project by combining transportation changes, economic impact, benefit-cost and other financial analysis, environmental benefits and land use and social impacts. EDR Group and SDG completed five sets of project alternatives. The purpose of the Benefits Case was to undertake a comparative analysis of feasible options for a specific rapid transit project and present the results in such a way that it will assist decision makers to select a preferred option fo implementation.

Scarborough Rapid Transit Benefits Case

Yonge North Subway Extension Benefits Case

Hamilton King-Main Benefits Case

 

Latest Blogposts

Twitter Feed

Dispatches from TRB's Transportation Resilience 2019 https://t.co/P3t9aH5iZL https://t.co/GF9Ar23S0R
For the Asia Development Bank, EDR Group is conducting an econ impact assessment on a new border crossing between K… https://t.co/fupjkEC46I
Dispatches from the Consortium for Scenario Planning 2019 Conference https://t.co/zG6uOehft5
 

Telephone: 1-617-338-6775 - This email address is being protected from spambots. You need JavaScript enabled to view it.

© 1997-2019 Economic Development Research Group, Inc; 155 Federal St. 6th Floor, Boston, MA 02110 USA